Compact Track Loaders cut the ribbon on Osan Air Base’s new Airfield Damage Repair warehouses
The interior of a new Airfield Damage Repair warehouse, Osan Air Base, on Dec. 3, 2025. The facility is the largest of several built by the U.S. Army Corps of Engineers – Far East District over the past few years, measuring nearly 400 feet long, extending beyond the length of a football field. (U.S. Army photo by Rachel Napolitan)

Download Image: Full Size (1.77 MB)
Photo by: Rachel Napolitan |  VIRIN: 251203-A-QR280-1056.JPG