US Army Corps of Engineers
Far East District U.S. Army Corps of Engineers Website

Chapel construction commences with chaplain, ceremony
On April 30, 2013, the garrison chaplain met with the FED construction team and the construction contractor, and held a prayer ceremony on the freshly placed floor slab of Chapel #1 in lieu of a traditional groundbreaking.

Download Image: Full Size (0.79 MB)
Photo by: U.S. Army Corps of Engineers |  VIRIN: 130430-A-GJ792-999.JPG